Step & Touch Voltage Analysis

Safety analysis and mitigation of hazardous step and touch potentials at electrical facilities.

Service Overview

Step and touch potential hazards represent one of the most serious safety risks at electrical facilities. During a ground fault event, dangerous voltages can appear on the surface of the earth near a grounding system — creating hazardous conditions for personnel who may be standing near the fault location (step potential) or touching grounded equipment (touch potential).

E&S Grounding Solutions performs comprehensive step and touch potential analysis using CDEGS computer modeling to evaluate the safety of grounding systems under fault conditions. Our engineers calculate the tolerable limits per IEEE 80 and compare them against the actual potentials predicted by the model — identifying areas where hazardous conditions exist and designing mitigation measures to bring the system into compliance.

Proper step and touch potential analysis is required by IEEE 80 for all new substation designs and is strongly recommended for existing facilities where personnel safety cannot be confirmed.

Key Benefits

  • IEEE 80 compliant step and touch potential analysis
  • CDEGS computer modeling for accurate fault condition simulation
  • Identification of hazardous areas within and around the facility
  • Mitigation design including ground grid modifications and surface treatment
  • Personnel safety verification for existing and new facilities
  • Written report with analysis results and mitigation recommendations

Ready to discuss your project?

+1 310-318-7151

Our Process

1

Data Collection

Fault current levels, soil resistivity data, and facility grounding drawings gathered.

2

CDEGS Modeling

Complete grounding system modeled in CDEGS under fault conditions.

3

Potential Analysis

Step and touch potentials calculated and compared against IEEE 80 tolerable limits.

4

Mitigation Design

Ground grid modifications, surface treatment, and other mitigation measures designed as needed.

5

Report Delivery

Detailed report with analysis results, hazard maps, and mitigation recommendations.

Standards & Codes

IEEE 80IEEE 142NFPA 70 (NEC)OSHA 29 CFR 1910.269

Industries Served

Electric UtilitiesSubstationsTransmission LinesIndustrial FacilitiesPower GenerationRenewable Energy

Request a Step & Touch Potential Analysis

Contact our team of licensed engineers to discuss your project requirements and receive a customized proposal.

Schedule a Free Consultation

Our expert engineers are ready to help you solve your most complex grounding, bonding, and lightning protection challenges.